Menu
Your Cart

RPTFE Seated Forged Steel Underground BW End Maintenance Free Full Welded Ball Valve For Gas Applications

RPTFE Seated Forged Steel Underground BW End Maintenance Free Full Welded Ball Valve For Gas Applications
RPTFE Seated Forged Steel Underground BW End Maintenance Free Full Welded Ball Valve For Gas Applications
  • Availability: In Stock
  • Product Model: QA61F
$0.00
Ex Tax: $0.00

RPTFE Seated Forged Steel Underground BW End Maintenance Free Full Welded Ball Valve For Gas Applications

 

Construction is as follows:

 

Name Full Welding ball valve
Size DN25-DN400
Normal pressure PN10~PN40, CLASS150~300
Design standard API 6D, API 608,ASME B16.34, MSS SP-72; BS5351,ISO17292,EN13709
Marked MSS SP-25
Fire safe design API607,API 6FA
End flange ANSI B 16.5,ASME B16.47; EN1092,DIN2543~DIN2547,AS2129
Top flange ISO 5211
Test standard API598,API6D; DIN3230,EN12266,ISO 5208
Suitable temperature -29~150°C
Medium All kinds of industrial gas and heat pipes
Acidic environment NACE MR0175
Operation Hand Operated,Gear Operated, Electrical Actuated, Pheumatic Actuated

 

Product Description

 

- Fully Welded Ball Valve with BW ends or Flange Ends

- Used for Gas, oil, Stream, and Heating system

- Body material is Carbon Steel or Stainless steel

-Ball is SS304, SS316

- Seat: RPTFE

- Rating is with PN25, PN40

- Surface: FEB Epoxy Power Coated

 

Main Part & Materials

 

Serial No. Parts Material
1 Body WPB, A105,SS304/SS316,F11/F22
2 Shaft Housing Of Valve Rod WPB, A105,SS304/SS316,F11/F22
3 Ball Stainless Steel, ANSI 304
4 Stem Stainless Steel, AISI 304
5 Ball Seal Carbon Enhancement PTFE
6 Packing Ring WPB, A105,SS304/SS316,F11/F22
7 Handle Zinc-plated Steel
8 Packing Flexible Graphite
9 Gasket PTFE


Characteristics

  • Maintenance Free, Easy For installation, Low ownership cost
  • No unreliable casting parts
  • Full port or reduced port
  • Fire safe design, API 6FA
  • Anti-Static Design & Blow-out proof stem
  • Extended stem for option
  • Underground usage

Application

 

1. City gas: gas output pipeline, the main line and each branch piping and other equipment maintenance.
2. Central heating: large heating equipment output line, main line, branch piping.
3. Heat exchangers : Pipe and each loop opening and closing.
4. Steel plant: a variety of liquid pipelines, optional release gas pipelines, gas and heat piping equipment maintenance, fuel equipment maintenance.
5. A variety of industrial equipment: various heat pipes, all kinds of industrial gas and heat pipes

Write a review

Note: HTML is not translated!
Bad Good
This is the sticky Notification module. You can use it for any message such as cookie notices, special promotions, or any other important text.